PORTFOLIO
2024
Project of Hydraulic Installations for the Construction of Three Multi-Family Residential Buildings with an Underground Garage at Geschwister-Scholl-Straße, 15370 Fredersdorf-Vogelsdorf.
Project of Hydraulic Installations for a Residential-Business Complex Consisting of Five Sections with Above-Ground Floors Ranging from Ground Floor + 5 + Attic to Ground Floor (with Gallery) + 5 + Attic, Including an Underground Garage on Construction Plot 01, Formed from Land Parcels 200/2, Part of 199/1, 199/2, and 518/1, Cadastral Municipality Mali Mokri Lug.
Water Supply Network in Ante Bogićević Street in Mali Zvornik (Connection to the Water Supply Network of Radalj Settlement) Including Underboring of the State Road and Railway Track.
Rehabilitation of the Primary Water Supply Line DN250mm from Building V-8 to the Old Bridge.
Hydrant Network Project within the "EcoMet Recycling" Factory Complex.
Project of Hydraulic Installations for the Hydro Booster Station within the T1 Factory Complex in Ada.
Project of Hydraulic Installations for the Fire Station in Bosilegrad.
Project of the Pressure Pipeline from the "Pilica" Source to the "Glišino Brdo" Reservoir in Bajina Bašta.
Supervisory Control and Data Acquisition (SCADA) System for the Water Supply Network of the Municipality of Kula – Location: Kula.
Project of Hydraulic Installations and Pool Technology for the Construction of a Swimming Pool with Slides and Technical Rooms in the Ada Settlement.
Project of Water Supply and Firefighting Networks, Stormwater and Sanitary Sewage Systems with a Stormwater Pumping Station within the Dr. Milenko Marin Hospital Complex in Loznica
Project of the Pressure Booster Station for the Firefighting Network within the "Tisza Automotive" Complex.
Project of Missing Infrastructure (Hydro Booster Station) within the "Stojčino Brdo" Reservoir Complex in Belgrade.
Project of Missing Infrastructure (Water Supply Network, Stormwater, and Sanitary Sewage Systems) in Nine Kirsanove Street and King Aleksandar Boulevard in Belgrade.
2023
Project of the Sanitary Sewer Network for the Ruski Krstur Settlement, with a length of 38 km.
Part of the Project for the Wastewater Treatment Plant in Herceg Novi, Montenegro.
Project of Hydraulic Installations for the Building on Ravanička Street (1633 m² Gross Building Area).
Project of Hydraulic Installations for the Textile Manufacturing Factory "Alpina."
Project of Hydraulic Installations for the Health Center Building in Aleksandrovac
Project of the Primary Water Supply Network for the Lučice Settlement (L=4348m) with a Water Supply Reservoir (500m³).
Project for the Construction of a Water Supply Network, a Small Pumping Station, and a New Reservoir for a Part of the Crvica Settlement in Bajina Bašta.
Project of the Sewerage Network on Zlatar with Two Pumping Stations.
Project of Hydraulic Installations for the Agriculture Building - Farm with a Capacity of 700 Cattle (IPARD Program).
Project of Hydraulic Installations for the Facility for Storing Agricultural Products, Raw Materials, Machinery and Equipment Storage, and Water Storage Reservoir (IPARD Program).
Project of a Wastewater Treatment Plant (WWTP) in the Ruski Krstur Settlement.
Development of the Sewerage Network Project in the Municipality of Bor, with a length of 102 km.
Development of the Project and Execution of Works for the Beach Improvement in Mali Zvornik.